HOUSING IN PREMIÀ DE MAR

Work in progress.

The building takes advantage of the slope to break the volume in two bodies, separated and connected by the access core, acting as ball joint and union point between both volumes. In order to minimize the impact of the building on the area, the volumes are emptied by generating terrace areas or retracted balconies that don’t surface out of the façade, what contributes to make the volume more inviting within its surrounding environment and confers a more domestic scale to the project.